Skip to main content

Highway Viaduct Bridge — Australia

Request a Quote

Project Overview

A 1.8 km highway viaduct required heavy-duty falsework for the deck casting. We supplied cuplock and ringlock scaffolding components engineered to the project load tables.

Deliveries were staged to match the pour schedule, with all components hot-dip galvanized for the coastal environment.

Production Line Configuration